The water is emptied out of the pool & old coping stones removed.
Our team will then remove the old tiles.
Then if required any modifications and structural changes are made such altering depth, adding steps, bubble seats etc as requested by the client.
At this stage all pipework is pressured tested and repaired or replaced as agreed by the client (including modications and updating of pump house and filter system).
After all changes & repairs are completed a new tile band is added of the clients choice.
Next the new coping stones are laid if required, chosen by the client from a wide range of styles and finishes.
The pool is then prepared for the pebble finish.
Once the pool is pebbled applied it is jet washed and acid cleaned to reveal the natural pebble finish.
Any terracing repairs or renewals are carried out and the area cleaned.
Pool is now filled and checked.